It’s been a long time since I’ve updated, and I can’t say that we’ve gotten a lot done in the meantime. Between the new baby, Sarah having hernia surgery and accompanying recovery, and a break in momentum I’ve struggled to regain, we just haven’t gotten much done. The sense of stagnation is worsened by the flurry of work going on next door. In the last two months they’ve torn down the garage, dug down the basement and poured a new floor, re-shingled the roof, installed steel beams in the basement and first floors, new front and back porches, and completely framed the interior! We’re comforting ourselves by noting the things they did poorly, but it’s still tough when we’re not making much progress.
The focus at the moment remains the first floor stairs, specifically the landing. I spent a lot of time over the last few weeks staring into space on the first floor and then checking back to the revised plans. It’s one thing to have dimensions figured out and another to actually put hammer to nail, or impact driver to screw, as the case may be.
I started by building the corner support column, but the studs were depressingly wonky despite clamps and effort, so I took it apart and re-did it better. The parts that I struggled with the most were the points where the cross members met. I want everything to be supported well since it will be bearing the weight of the stairs, but that meant some complex corner joints. I wound up buying some brackets and joist hangers to reinforce everything, and the end product is very sturdy.
The stringers are on back order until the end of the month, so I plan to fill the intervening time by completing some of my unfinished projects and by framing out the coat closet and the rest of the wall at the back of the kitchen.